Tagged : route 1 RSS Icon
Found 2 blog entries tagged as route 1.

 

 

Coalition for a Safer North Bethany Beach has announced that two events have been scheduled regarding the DelDOT Study along SR 1 between Bethany Beach and the Indian River Inlet Bridge. The purpose of the Study is to evaluate alternatives that will improve safety and provide low-stress bicycle and pedestrian facilities, and to develop a conceptual design and cost estimate for a recommended alternative. DelDOT will also be installing short-term improvements including three Rapid Rectangular Flashing Beacons. This spring, there are three ways you can learn more and provide feedback on the Study and planned short-term improvements:

 

  1.       Attend the May 8 Public Workshop in person at the South Coastal Library

The Delaware

214 Views, 0 Comments
Read Full Post

Provided by Delaware Department of Transportation

RRFB Locations

The purpose of the North Bethany Bicycle and Pedestrian Corridor Study is to evaluate alternatives to provide low-stress bicycle and pedestrian facilities along SR 1 between Bethany Beach and the Indian River Inlet Bridge, and to develop a conceptual design and cost estimate for a recommended alternative. These concepts will be developed based on the public feedback received to date and the results of the existing conditions assessment. The potential alternatives may include recommendations for traffic calming, median crossover closures/consolidations, shared use path(s), protected bike lanes, dedicated right-turn lanes, sidewalks, and crossing improvements.

Public Process

Concepts

191 Views, 0 Comments
Read Full Post